Hungary's Mol to start massive gas exploration project
According to the ministry's statement, Szijjártó announced after the Hungarian-Kazakh summit that energy cooperation was a priority item on the agenda. The minister stressed that diversification will be extremely important in the future, and it will be of strategic importance for Hungary to be able to buy energy from more sources.
In this context, Szijjártó stressed that
Kazakhstan could be an important source of diversification in the coming period,
and the role of the Central Asian country will increase in both oil and gas supply.
Already this year we are buying a record amount of oil from Kazakhstan, which is arriving in Hungary by a mix of land, pipeline and sea,
he said. Szijjártó added that about 630,000 tonnes of Kazakh oil will be shipped to Hungary this year.
The minister stressed that Mol, together with its Kazakh and Chinese partners, will start the extraction of the Rozhkovskoye gas-condensate field in Kazakhstan before the end of this year, in December, after 15 years of preparatory work. According to Szijjártó,
the Hungarian company will be able to produce around 100 million cubic metres per year as production ramps up,
and once this has been processed, a decision on its sale can be made.
This is a particularly high figure even by Mol's standards, as the company's gas production volume in Hungary was 1.4 billion cubic metres last year - group-wide gas production in 2022 was 2.4 billion cubic metres, of which the Kazakh project will account for 4.2%.
Back in March, in the wake of a gas find in Hungary, a Mol executive recalled that the government's plan was to increase the domestic production figure from 1.4 billion to 2 billion cubic metres. Total domestic gas consumption averages around 8.5-9 billion cubic metres, hence the country's import demand is particularly high.
Cover photo: Getty Images









