Hungarian State Railways announces station renovation programme
According to MÁV Group CEO Zsolt Hegyi in a video posted on his Facebook page, the programme was initiated by János Lázár, Minister of Construction and Transport. The selected stations are not the country's busiest but handle significant traffic in their respective regions.
As part of the Hungarian Village Programme, 11 locations will receive new, temperature-controlled passenger waiting areas
where either no buildings existed previously or where existing structures were in such poor condition that they had to be demolished.
At 19 locations, existing reception buildings will be renovated. The upgrades include passenger areas, temperature-controlled waiting rooms, refurbished toilets, facade renovations, and improvements to the surrounding environment.
Where present, underpasses and stairs leading to platforms will also be renovated. The CEO highlighted the renovation of Gyula station's reception building as particularly significant, stating that the building, restored to its original historical appearance, will serve as a worthy gateway to the Great Plains spa town.
Zsolt Hegyi emphasised that
while track and vehicle upgrades are important, station conditions also contribute to service quality.
Work has already begun in Leányvár and Esztergom-Kertváros.
The investment will be funded through MÁV's own resources and support from the Hungarian Village Programme.
The renovation programme includes the following stations: Ács, Ajka, Aranyosapáti, Balmazújváros, Bashalom, Berettyóújfalu, Demecser, Esztergom-Kertváros, Felsőzsolca, Gárdony, Győrasszonyfa, Gyula, Jászberény, Kisvarsány, Kőbánya alsó, Leányvár, Magyarbánhegyes, Martonvásár, Mátészalka, Nyíradony, Nyírbogát, Ópályi, Pécsudvard, Poroszló, Püspökhatvan, Salgótarján, Sárrétudvari, Szalatnak, Szerep, Szépjuhászné, Tiszaalpár, Tiszajenő alsó, Tokaj, Várpalota, Villány.
Cover photo (for illustration purposes only): Portfolio









