A scathing assessment of the Hungarian electricity network

Portfolio
The Hungarian Energy and Public Utility Regulatory Office (MEKH) has recently published its 2024 report on the quality of the electricity supply. While the report shows that the overall quality of electricity supply in Hungary improved in 2024 compared to previous years, it also reveals that several distribution companies' supply reliability is below the expected level. We have examined the extent of the problem.
DEBRE20250709003

For example, distribution system operators (DSOs)

have failed to meet the expected timeframe for repairing medium-voltage network faults for over a decade,

with the annual national average for this indicator steadily declining since 2018.

The report states that all six domestic DSOs and the transmission system operator (TSO) met their mandatory quality standards in 2024. These are: (i) the average frequency of unplanned supply interruptions, (ii) the average duration of unplanned supply interruptions, and (iii) the outage indicator. (The latter is a metric that represents the ratio of electricity not supplied to the electricity available. It's often expressed as a percentage and reflects the reliability of the power supply.)

However, the report identified shortcomings in the area of non-mandatory quality requirements which do not directly impact consumers' security of supply.

  • average frequency of planned interruption of electricity supply,
  • average duration of planned interruption of electricity supply,
  • restoration of supply within 3 hours in the event of an unplanned interruption of supply,
  • restoration of supply within 6 hours in the event of a planned interruption of supply,
  • the number of medium-voltage network faults per unit of network length, and
  • the specific recovery time for faults in the medium-voltage network.

The different importance of compliance is also reflected in the fact that non-compliance with mandatory requirements would have economic consequences for network companies, whereas non-compliance with non-mandatory indicators would not. In the case of the former, a non-compliance rate of 5% will result in a reduction in the distribution tariff for users and a fine may be imposed on the relevant DSO.

Additionally, the decision includes monitoring indicators that are not yet linked to minimum quality requirements or expected standards. These include the average frequency of momentary supply interruptions.

Overall, the picture is positive. However, a more detailed assessment of the MEKH's report shows that

several DSOs are performing below expectations in terms of both continuity of supply and network reliability.

The report shows that the national average frequency of planned electricity supply interruptions lasting more than three minutes has deteriorated markedly in 2024 compared to the previous year.

During the three-year period from 2022 to 2024, only two DSOs — E.ON Dél-dunántúli Áramhálózati Zrt. and ELMŰ Hálózati Kft. — met the expected standard. Notably, every DSO that did not meet the expected standard showed an increase in the extent of non-compliance.

The average duration of planned power cuts lasting more than three minutes is also unfavourable. In 2024, the national average annual duration of planned power outages increased by 15% compared to the previous year. As in previous years, the expected level of the indicator was met only by E.ON South Transdanubia and ELMŰ; all other DSOs showed a noticeable increase in the average annual duration of planned power outages.

However, there has been an improvement in the average annual rate of reconnections within six hours following a planned supply interruption. Nevertheless, only four DSOs — E.ON Dél-Dunántúl, ELMŰ, ÉMÁSZ and TITÁSZ — met the expected standard in 2024.

In terms of network reliability, the national average number of medium-voltage overhead line failures per unit length of network decreased slightly last year compared to 2023. However, as in previous years, only E.ON South Transdanubia, E.ON North Transdanubia and ÉMÁSZ met the expected level.

Problematic areas also include response times to medium-voltage grid failures. For more than a decade, distributors have failed to meet the expected timeframe for repairing medium voltage network faults. The annual national average for this indicator has steadily deteriorated since 2018, and the deviation from the expected level has increased further in 2024.

Therefore, overall, it can be concluded that

no distributor currently meets the expected standards for all non-mandatory indicators fully.

Although these do not directly impact consumers' security of supply, MEKH points out that they reflect the significant network development work and challenges posed by the spread of decentralised generation for DSOs.

The large-scale penetration of solar panels in Hungary is the main feature of the country's decentralised generation. These panels are exceptional worldwide and are leading to a number of grid, system and market problems that may already be having an indirect impact on security of supply.

However, according to MEKH's assessment, the system operator MAVIR Zrt. met the minimum quality requirements for ensuring the operational safety of electricity transmission in 2024.

Cover photo: MTI Photo/Zsolt Czeglédi

 

More in Energy

szászhalombatta-dunai-finomító-mol-olajfinomító-százhalombatta-olajipar-energetika-kőolaj-olaj-üzemanyag-finomító
February 27, 2026 16:17

Friendship outage: Brussels responds to Viktor Orbán's letter and also sends a message to Mol

Debate over Hungarian oil supplies escalates further, reaching political depths

GettyImages-2251563303-volodimir-zelenszkij-Európai-Unió-ukrajna-ukrán-elnök-EU-diplomácia-külpolitika-politika-uniós-csatlakozás-orosz-ukrán-háború
February 26, 2026 09:47

Zelenskyy says Druzhba oil pipeline cannot be repaired "so quickly" despite EU pressure

Viktor Orbán wrote an open letter to the Ukrainian President urging him to "stop his anti-Hungarian policies"

Radoslaw SIkorski lengyel külügyminiszter
February 26, 2026 08:31

Polish Foreign Minister urges EU fact-finding mission to prove Hungarian claim in Ukraine wrong

'We are not close to peace yet' - he says

magyarorszag-ukrajna-europai-unio-zaszlo
February 25, 2026 14:11

European Commission: alternative route can be secured for Hungary's oil supply

The situation caused by the shutdown of the Friendship oil pipeline is becoming increasingly complex

LNG
February 25, 2026 13:30

MET Group inks MOU on LNG with Shell

Deepening their relation further

LATEST NEWS
Charting is displayed using TradingView's technology, a platform, where you can build advanced charts, spot upcoming trends in the stock screener, and find inspiration in multiple trading ideas

Detailed search